Implemented projects
Our entire team of professionals is proud of each implemented project – assistance in the selection of apartment finishing materials or extensive finishing material deliveries and installation works at public buildings. Here are some of the largest projects we have implemented.
For projects, contact us by phone: +371 26456183,
e-mail: dmitrijs.bugajevs@reaton.lv.
LLC "Kronus" administrative office
Paved carpet tiles from Milliken and installed acoustic partition walls from SWG Group.
"Cabot Latvia" business service center
Supplied DESSO and Tarkett carpet tiles and stone tiles from EnergieKer.
Mežaparks Great Bandstand
Installed Coswick parquet, tiles from Refin and carpet tiles from Forbo Tessera.
RADEX office and warehouse building complex "Lielcirši"
Supplied Modulyss carpet tiles, Imola Ceramics and RAKO tiles. Installed ceilings from Ecophon and Armstrong and plumbing from Ceramica Globo, Ideal Standard, Faneco, Geberit
Pauls Stradiņš Clinical University Hospital
The installation of the ventilated facade has been realized.
Residential building project “Philosophers Residence”
Supplied “FAP Ceramica” tiles , “Ceramica Paradyž” tiles for the facade and Deutsche Steinzeug Agrob Buchtal” ceramic tiles for the facade, “Eternit” fibre cement tiles for the facade. 118 sets of EI-30, 37 db flat entrance doors; internal doors - 231 set.
Hotel “Hilton Garden Inn”
Supplied ETERNIT fibre cement boards for the facade and Ideal Standart plumbing.
Premium class apartment building
Installed FAP Ceramiche tiles, delivered Novamobili furniture and supplied Ceramica Globo, Nicolazzi plumbing.
Apartment project “Cēsu Terraces”
Realized flooring from Reaton - parquet Meister.
Row house project “Mežaparka Residences”
Installed Emil Ceramica tiles, Bellosta, Duravit plumbing and Boen parquet.
Administrative building “Jaunā Teika”
Designing of the load-bearing structure from thermoprofiles. Design of the ventilated facade substructure. Installation of load-bearing frame from thermoprofiles. Fermacell plate assembly. Iinstalling of ventilated facade, substructure, thermal insulation, ceramic tiles Paradyž. Finishing with NEOBOND composite panels;installation of external window sills and decorative tin elements. Plastering of the interior walls;laying of carpets in the Accenture office.
Medium class apartment building
Realized flooring from Reaton - Boen parquet.
Multi-apartment house
Realized flooring from Reaton - Boen parquet. Installed suspended ceiling “Ecophon”.
Residential building complex “Ezerparka Nami”
Realized floor coverings from Reaton - tiles Paradyz Ceramica and laminate Kronospan.
Hotel “Radisson Blu Latvija Conference & Spa Hotel”
Installed stoneware tiles “Cooperativa Ceramica D’Imola”, ceramic tiles “Deutsche Steinzeug Keramik”. Realized substructure of ventilated facade “WS Fassadenelemente”.
“Astra Lux” is a multi-storey residential house.
Installed ceramic tiles “Deutsche Steinzeug Keramik”. Realized substructure of ventilated facade “WS Fassadenelemente”.
Shopping centre “ORIGO”
Realized substructure of ventilated facade “Метроспецстрой-Девелопер”. Installed granite “Xiamen Chiefstone”.
Contacts
Reaton finishing material shop working hours:
Mon-Fri: 9:00-18:00
Sat: 10:00-16:00
Sun: closed.
mc2 interior and finishing materials departments working hours:
Mon-Sat: 10:30-19:00
Sun: closed.